Home

E-Mail Us

Beau's Place

Bird Safe Wood 

Under construction

 

ig out begins                                      Raw land Before moving the trailer       The Creek  Low 2006     

 

Let the fun begin                               Getting the far corner, no pump truck needed

Leonard lifting up the glue lams                        Looking at the House from the road

 

Looking down at the creek through the Deck Door   Lifting trusses Up to the roof        

 

Roof going on                                                  Wrapped and ready to dry out

   

Beau checking out his new corner        Temporary Stairs. Windows and siding    Standing in Beau's corner and shooting the Kitchen                                       starting to go on                                                                                      

 

Deck is on, no rails yet! Tight knot cedar. Beaus corner insulated and ready for sheet rock.

  

All vents in and back steps going up.                   

 

Beau looking out his window, Painted his wall yesterday. Here he is in my bedroom against my blue wall.

Here is Beau in the guest room.                        Ned Putting on the first coat of a 2 part water-proof epoxy.

Figuring in the wood is really starting to show     

These three shots show the clamping needed to put together the vanity

These three pictures are of the counter top from the stove across to the corner of the wall. Figured Maple with Black Wallnut Inlay across the front.

These pictures show the second counter top being put together

 

Black Walnut inlay                                Me in the dry well ditch

Back of house that looks out over the creek